Builders Risk Value Worksheet
KCRI · TOOL 03
Builders risk should be written on what the project will be worth when it’s finished, not what’s in place today. Add up the numbers below to get the values to talk through with your agent. Your numbers stay in your browser.
The worksheet
Work down the lines with your contract, budget and any appraisal in front of you. You can do this on paper; the calculator below just adds it up for you.
| Line | What to enter | How it’s used |
|---|---|---|
| A | Hard costs: construction contract price. Labor, materials, and the GC’s fee and overhead for the work being built. | Part of completed value |
| B | Owner-supplied materials and equipment. Anything the owner buys separately that gets installed (appliances, fixtures, equipment). | Part of completed value |
| C | Expected change orders or contingency. Planned upgrades or the contingency in your budget. The limit has to keep up if the job grows. | Part of completed value |
| Materials on site waiting to be installed. These are usually already inside line A or B. Don’t add them a second time. | Check, don’t add | |
| Completed value of the new work | A + B + C | |
| D | Existing structure (remodels and additions only). The cost to rebuild the existing building: replacement cost, not market value or purchase price. Leave blank for ground-up projects. | Added to the total |
| E | Soft costs (only if you plan to add this coverage). Monthly carrying costs if the job is delayed (construction loan interest, taxes, extra professional fees, and rent or income you’d lose each month) times the months of delay you’d want covered. | Added to the total |
| Total values to review with your agent | A + B + C + D + E | |
| F | Materials in transit or stored off site. The most you expect to have on trucks or in storage away from the site at any one time. | Compare with the transit and off-site sublimits. Not added to the total. |
The land isn’t on the list. Builders risk insures the building and materials, not the dirt.
Example only Made-up numbers for a ground-up project, to show how the lines add up. Not a real project, and not a quote, a rate or a premium.
| A. Construction contract price | $2,400,000 |
| B. Owner-supplied materials and equipment | $0 |
| C. Expected change orders or contingency | $100,000 |
| Completed value of the new work (A + B + C) | $2,500,000 |
| D. Existing structure (ground-up, so none) | $0 |
| E. Soft costs: $20,000 a month × 6 months | $120,000 |
| Total values to review with your agent | $2,620,000 |
| F. Most materials off site or in transit at one time (check the sublimit) | $150,000 |
Calculator
The live totals need JavaScript. If they don’t appear, use the worksheet table above. It works the same way.
| Completed value of the new work (A + B + C) | $0 |
| Existing structure value (D) | $0 |
| Soft cost amount to discuss (E1 × E2) | $0 |
| Total values to review with your agent | $0 |
| Off-site and in-transit amount to check against sublimits (F) | $0 |
A worksheet, not a quote or a coverage decision. The policy, its limits and its endorsements decide what’s covered. Your numbers stay in your browser.
What goes in, and what doesn’t
- In: the full contract price, owner-supplied materials that get installed, and growth you already expect from change orders.
- Not in: the land. Builders risk insures the building, not the dirt.
- Ask about: foundations, underground work and site work. Some forms treat these differently, so confirm how yours handles them.
- Soft costs are only covered when they’re added to the policy. If a fire puts the job months behind, loan interest and lost rent keep running. See what builders risk covers and doesn’t.
Renovations: don’t leave the existing building out
On a remodel or addition, the existing building is still standing and still at risk while you work on it. A small renovation budget can leave a much bigger building exposed. Read how existing-structure coverage works on a renovation.
Before you bind, confirm
- The policy limit matches completed value, not today’s value.
- How the existing structure is valued, if there is one.
- Whether soft costs and delay are endorsed, and the limit and waiting period.
- Coverage for materials in transit and stored off site, and the sublimits.
- What happens if the job is still going when the policy term ends.
Want a second set of eyes on your numbers? Talk to us about builders risk insurance in CA and TX.